In appearance, it resembles a modified excavator or drill jumbo, yet it is equipped with an extra “arm”. The end of the working boom can quickly switch among three operating modes: drilling, rock bolt installation and grouting. Some dual-boom models can even carry out drilling and bolt installation simultaneously for higher efficiency.
Its working process is outlined below:
1. Drilling: The working boom is positioned at the designed location. The drill bit rotates and impacts to bore a hole of specified depth into the rock face.
2. Rock bolt installation: The boom picks up a rock bolt from the onboard bolt magazine and accurately feeds it into the newly drilled hole.
3. Grouting: Cement grout is injected through the hollow inner bore of the rock bolt to firmly bond the bolt to the surrounding rock.
The entire operation can be handled by one operator with only a small number of auxiliary workers using this single machine. It realizes the core goal of “replacing manual work with machinery and cutting on-site manpower via automation”.